Murrayhill Owners Association MOA

Design Guideline Changes

 

The Board of Directors has approved  additions and changes to the Solar  Installation and the Roof Forms and Materials sections of the Design Guidelines.  A new application has been created and approved specifically for solar projects. To  download please click on one of the links below:

Download Roof Forms and Materials(2013_11_21)

Download Solar review and installation revisions(2013_11_21 & 2014_10_16)

Download Solar Roof Device Application

Download full copy MOA Design Guidelines(2004_10_16)

 

website by web design portland :: ciwd